Well, I'm making slow process. Between looking for a new career as I burn through my savings, to say the least has been a challenge. Finally got the new fuel system in. New tank and fuel pump assembly. After a couple days of wrestling with the engine and the hoist , it's in and bolted down. As you can see, I had to build a temporary "Deck" so I could extend the boom out far enough to get everything in and lined up. It's a crazy tight space to do what I'm doing.
I'm ordering parts as I go along and trying to figure out what is missing over the years between when it was parked and now. The weather has been crazy too but it's Tennessee. Next, I need to start routing wires and plugging things back in. I need to make something to prime the oil system just to make sure everything has an oil film before I try to start it. I still need the coil mount and coil. New transmission cooler lines. New belt. Then the bigger ticket items like tires. I think I may use the battery off my car for now. Just to get it runny and run in the new cam and lifters. My goal as of now is to get it running/moving so I can get rid of a storage bill ( I still have another unit with 2 of my 3 motorcycles ) I need to do a big purge. I'll try to keep y'all posted as things move forward. Thanks for all the help and tips.